Complete our go-live checklist to ensure you are going into production following all of the Sisense best practices!
Ensure A Healthy Production Environment | ||
![]() |
Complete Dev to Prod Migration | Sisense assets have been migrated to your Production environment. |
![]() |
Automation | Backups, SSO, and other ongoing uses of the Sisense REST API have been automated. |
![]() |
Asset Cleanup | Unused dashboards and elasticubes have been archived, unused tables and columns have been removed. |
![]() |
Unused Plugins Disabled | Unused plugins are disabled to reduce the risk of code conflict and performance issues. |
![]() |
Monitoring Tool | Build times, systems resources, and other performance metrics are being monitored via Sisense Monitor. |
Complete Configuration Set-Up | ||
![]() |
System Configuration | System Configuration options are set for launch day, such as emails, end-user report scheduling, and enabling Usage Analytics. |
![]() |
User and Group Configuration | User and group configuration are complete. |
![]() |
Row-Level Data Security | Row-level data security rules for production assets are configured. |
![]() |
Sharing | Production elasticubes and dashboards have been shared with end users. |
![]() |
Remote Access | Sisense is accessible remotely for users. |
![]() |
Build Schedules | Elaticubes build schedules are set and live models are published with the latest changes. |
![]() |
Build Alerts | Builds alerts are set to notify admins about the outcome of a build process. |
![]() |
White Labeling | All aspects required to be re-branded have been configured, including emails, documentation links, etc. |
Perform Testing | ||
![]() |
Data Validation | Data integrity has been properly verified through the 10 Step Data Validation Guide. |
![]() |
QA Testing | All key functionality (access, emails, PDF exports, etc) work as expected and QA Testing is complete. |
![]() |
UAT Testing | Signoff from key end users via UAT Testing has been communicated. |
![]() |
Load Testing | The application has been tested under "standard conditions" for the deployment and Load Testing is complete. |
Drive End-User Adoption | ||
![]() |
End-User Pulse Alerts | Deployment with at least 1 Pulse alert is planned to drive adoption of the product. |
![]() |
Release Announcement | A release announcement to introduce and promote your new product is prepared. |
![]() |
Support Strategy | An ongoing support strategy is in place to support questions and requests. A good place to start is a FAQ page. |
![]() |
End-User Training | Contact your CSM for information on how to rebrand the Sisense online training assets or create your own training content. |
![]() |
Development Roadmap | Ongoing dashboard and feature releases are documented and tracked. |
![]() |
On-Going Adoption Strategy | An on-going adoption strategy is in place that includes product feedback from your key end users. |